Price list |
№ |
Services |
Unit |
Price BYN |
1. |
Landscaping |
LAWN ARRANGEMENT (excluding the cost of materials) |
1.1 |
Arrangement of sowing lawn on a ready-made base |
1 m2 |
3 |
Arrangement of sowing lawn up to 2 ares |
1 m2 |
10.00 |
Arrangement of sowing lawn from 2 to 5 ares |
1 m2 |
9.00 |
Arrangement of sowing lawn from 5 to 10 ares |
1 m2 |
8.00 |
Arrangement of sowing lawn from 10 to 15 ares |
1 m2 |
7.50 |
Arrangement of sowing lawn from 15 to 20 ares |
1 m2 |
7.00 |
Arrangement of sowing lawn from 20 ares |
1 m2 |
6.50 |
1.2 |
Installation of a rolled sod on a ready-made base |
1 m2 |
5.00 |
Installation of a rolled sod up to 1 are |
1 m2 |
12.50 |
Installation of a rolled sod from 1 to 2 ares |
1 m2 |
11.00 |
Installation of a rolled sod from 2 to 5 ares |
1 m2 |
11.00 |
Installation of a rolled sod from 5 to 10 ares |
1 m2 |
10.00 |
Installation of a rolled sod from 10 to 15 ares |
1 m2 |
9.00 |
1.3 |
Installation of anti-mol net |
1 m2 |
1.50 |
1.4 |
Covering of sowing lawn with non-woven fabric |
1 m2 |
1 |
1.5 |
Sloping lawns arrangement |
1 m2 |
15.00 |
Planting |
1.6 |
Planting of plurannuals and small-fruit crops with a root system of up to 1 liter |
1pc |
1.50 |
1.7 |
Planting of plurannuals with a root system from 2 to 4 liters |
1pc |
3.00 |
1.8 |
Planting of fruit trees up to 2.5 m high |
1pc |
30.00 |
1.9 |
Planting of ornamental trees and shrubs (coniferous, deciduous) with a root system of up to 5 liters |
1pc |
8.00 |
1.10 |
from 5 to 10 liters |
1pc |
13.00 |
from 11 to 15 liters |
1pc |
18.00 |
from 15 to 60 liters |
1pc |
from 20.00-40.00 |
from 60 to 100 liters |
1pc |
from 40.00-60.00 |
from 100 to 200 liters |
1pc |
from 60.00-100.00 |
from 200 to 300 liters |
1pc |
from 100.00-130.00 |
from 300 liters |
1pc |
from 140.00 |
1.11 |
Planting of single-row hedge (ditch 0.4х0.4 m up to 0.8х0.6 m) |
1lin m |
from 15. 00-35.00 |
1.12 |
Planting of double-row hedges (ditch 0.4х0.6 m up to 0.9х0.6 m) |
1lin m |
from 25.00-40.00 |
1.13 |
Replanting |
1pc |
negotiable price |
1.14 |
Flower-bed arrangement (preparation of base + planting) |
1 m2 |
20.00 |
1.15 |
Creation of rose garden |
1 m2 |
20.00 |
1.16 |
Planting of flowers (annuals, plurannuals on a ready-made base) |
1 m2 |
10.00 |
1.17 |
Creation of floral compositions for hanging boxes, planting inside boxes |
a planter |
from 10.00 |
1.18 |
Planting of small bulbs (tulips, crocuses, daffodils, etc.) |
1pc |
from 0.30 |
2. |
Installation of special covering |
2.1 |
Arrangement of a mulching cover from bark and wood chips (weeding out a garden, planning, covering with geotextile, filling with bark or wood chips) |
1 m2 |
10.00 |
2.2 |
Arrangement of a mulching cover from decorative crumbs, crushed stone, gravel with a geotextile bedding (weeding out a garden, planning, filling using carts moving not further than 20 m) |
1 m2 |
15.00 |
2.3 |
Border tape installation |
1lin m |
4.00 |
2.4 |
Plasterboard installation |
1lin m |
5.00 |
3. |
Garden Maintenance |
3.1 |
Mowing |
1 are |
From 16.00 |
3.2 |
Flower-beds care (weeding, buds pruning, fertilizing, cleaning a territory, etc.) |
person / hour |
From 22.00 to 30.00 |
3.3 |
Lawn care(scarification/aeration + fertilization ) |
1 are |
35.00 |
3.4 |
Greenery care (cleaning, pruning, cutting, feeding, etc.) |
person / hour |
From 22.00 to 30.00 |
3.5 |
Pruning of fruit trees and shrubs |
1pc |
from 20.00-60.00 |
3.6 |
Treating a garden from diseases and pests (spraying) |
1 pc/15 L |
55.00 |
3.7 |
Tick control for garden |
1 are |
from 20.00 |
3.8 |
Weed control for lawn |
1 are |
from 15.00 |
3.9 |
Moss removal |
1 are |
from 30.00 |
3.10 |
Hedge cutting |
1 person/hour |
35.00 |
3.11 |
A drive to a house up to 10 km from the Minsk ring road |
1 drive |
40.00 |
3.12 |
Garbage disposal |
1 run |
negotiable price |
3.13 |
Departure to the site up to 10 km from the MKAD |
1 drive |
50,00 |
3.14 |
Cleaning and whitewashing tree trunks |
|
from 6 |
3.15 |
Garbage removal |
1 run |
negotiable price |
3.16 |
Crushing branches into chips up to 12 cm in diameter |
1 hour |
50 |
3.17 |
Other lawn work |
1 hour |
from 35 |
4. |
Preparatory work |
4.1 |
Installation of anti-mol net |
1 m2 |
1.50 |
4.2 |
Installation of non-woven fabric with holes for plants |
1 m2 |
3.50 |
4.3 |
Installation of non-woven fabric without holes |
1 m2 |
2.00 |
4.4 |
Disposing of construction waste |
1 person/hour |
25.00 |
4.5 |
Herbicides sprinkling |
1 are |
30.00 |
4.6 |
Manual digging and removal of weed roots |
1 m2 |
5.0 |
4.7 |
Land cultivation |
1 m2 |
2.50 |
4.8 |
Weeding out after cultivation |
1 m2 |
1.50 |
4.9 |
Draft land grading after heavy equipment |
1 m2 |
1.50 |
4.10 |
Moving carts of soil, sand, gravel, etc. at distances of 25-50m |
1 m3 |
from 25.00-45.00 |
4.11 |
Land grading (alignment, distribution of soil) |
1 m2 |
2.80 |
4.12 |
Soil compacting (rolling) |
1 m2 |
1.00 |
4.13 |
Sawcut of trees and shrubs |
1 person/hour |
35.00 |
4.14 |
Manual tree stumps removal |
1pc |
from 10.00-50.00 |
4.15 |
Load and material handling |
1 person/hour |
18.00 |
4.16 |
Manual excavation (digging ditches) |
1 m3 |
25.00 |
4.17 |
Backfilling (of ditches, pits) |
1 m3 |
15.00 |
4.18 |
Turf removal (manual) |
1 m2 |
4.00 |
4.19 |
Soil digging (manual) |
1 m2 |
3.00 |